Back to Top

1
Hi, Guest!
Circulating fluid bypass kit for PCU-NE1500

Circulating fluid bypass kit for PCU-NE1500

Update Terakhir 06 / 05 / 2024
Minimal Pembelian 1 Pasang

Harga

CALL
Bagikan
DESKRIPSI PRODUK

Detail Circulating Fluid Bypass Kit For PCU-NE1500

Fluid Control Optional for PCU-NE1500
This kit is used when the circulating water flow rate is below the rated flow rate. If the circulating water flow rate falls below the rated flow rate, the cooling capacity of the chiller unit may decrease.
Operating precautions :
- Recommended tightening torque is 40 to 45 Nm.
- Wind the seal tape clockwise.
- Turn on the PCU after laying the water piping in front of the bypass kit.
- If a water leak or some other problem occurs, stop using immediately.